Our Recent-Projects Include New Construction As-Well-As Addition and Renovation of Residential, Commercial, Condo, Light-Industrial, Multi-Family Buildings, ...
 
 
 
Here we feature a variety of our recent projects ... so visit with us often for the latest updates.
We will cover new construction, additions, and renovation projects. We work on residential, commercial, educational, light industrial, and a whole variety of interesting projects.
 Building with energy efficiency in mind makes sense not only economically -- it is our moral and ethical responsibility, and it is for the health and welfare of our families and our future generations.
 
 Energy efficiency can not be an after thought -- it must be a systems approach. The layout and planning, the structure ... the foundation, the walls, the floors, the roof, doors-and-windows, and HVAC, electrical, equipment and furnishings, all have an impact on the energy consumption of the building. It takes a team of competent professionals to build an energy efficient building.
 
 We treat every project as unique, and every new project, like a new born child, deserves our tender loving care and full attention.
 
 We will describe what is happening as it happens updating you with the latest descriptions and pictures.
 
 
 I believe it makes sense that in recent-projects we cover our current and most recent projects. So, in more-recent-projects ... we cover the other earlier (not so recent) projects.
 
 -----------------------
 Seerecent-projects-list for list of our energy efficient building projectsrecent-projects for our current and most recent projectsmore-recent-projects for our earlier (not the most recent) projects-----------------------
 Concrete-Strength-Basement-Wall-Pour-Building-in-Ann-Arbor-Michigan-Project-EneE1DomM1-101.html
 
 Placing-Concrete-in-ICF-Basement-Walls-Building-in-Ann-Arbor-Michigan-Project-EneE1DomM1-101
 
 Installing-ICF-Blocks-Basement-Walls-Building-in-Ann-Arbor-Michigan-Project-EneE1DomM1-101
 
 Footings-for-the-new-ICF-Building-in-Ann-Arbor-Michigan-Project-EneE1DomM1-101
 
 Starting-Costruction-of-a-new-ICF-Building-in-Ann-Arbor-Michigan-Project-EneE1DomM1-101
 
 Second-Floor-Balcony-Steel-Structure-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101
 
 Second-Floor-Steel-And-Open-Web-Joists-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101
 
 Second-Floor-Walls-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101
 
 Laundry-Room-And-Garage-Foundation-Walls-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101
 
 Wood-Decking-First-Floor-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101
 
 Purlins-Over-Open-Web-Steel-Joists-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101
 
 Open-Web-Steel-Joists-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101
 
 Structural-Steel-Framing-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101
 
 Basement-Walls-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101
 
 Replacing-Wall-Panels-Suffering-Water-Damage-From-Overgrown-Trees-Too-Close-To-The-House-ParR1-103
 
 Fix-For-Water-Leak-In-Basement-Leads-To-Repair-Of-FirePlace-Cap-And-Flashing-ParR1-102
 
 Fix-For-Broken-Bricks-And-Crack-in-South-Wall-Of-A-House-In-Southeastern-Michigan-Project-ParR1
 
 Angelicas-Place-Assisted-Living_Mar-31-2009-Update-Project-KalA1-101
 
 Rehabilitating-A-Foreclosed-House-In-Dearborn-Michigan-Part2-Project-OseH1-104
 
 Rehabilitating-A-Foreclosed-House-In-Dearborn-Michigan-Part1-Project-OseH1-104
 
 Rehabilitating-An-Existing-House-In-Wayne-Michigan-Part2-Project-MarB1-101
 
 Rehabilitating-An-Existing-House-In-Wayne-Michigan-Part1-Project-MarB1-101
 
 Industrial-Building-Addition-Project_As-Built-For-Process-Pits-In-The-Floor-ColB1-103
 
 Industrial-Building-Addition_Project-Status-As-Of-2009-03-11-ColB1-103
 
 Expert-Witness-Testimony-For-Evaluating-An-As-Built-Foundation-For-A-House-Project-RPG_1-101
 
 MindMap-For-Evaluating-An-As-Built-Foundation-For-A-House-Project-RPG_1-101
 
 Evaluating-An-As-Built-Foundation-For-A-House-Project-RPG_1-101
 
 Rehabilitating-A-Foreclosed-House-In-Dearborn-Michigan-Project-OseH1-104
 
 Rehabilitating-An-Existing-House-In-Wayne-Michigan-Project-MarB1-101
 
 Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-17-RosO1-101
 
 Installing-HVAC-Units-On-Roof-Of-An-Existing-Building-Part3-As-Built-Drawing-PonV1-101
 
 Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-14-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-14-RosO1-101
Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-13-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-12-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-11-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-10-RosO1-101
 
 Industrial-Building-Addition_Project-Status-As-Of-2008-11-04-ColB1-103
 
 Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-04-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Interior-Finish-Work-Part5-RosO1-101
 
 Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part7-RosO1-101
 
 Rosie-O-Gradys_Land-Scaping-In-Front-Of-Building-Addition-RosO1-101
 
 Rosie-O-Gradys_Synthetic-Stucco-Work-On-Exterior-Face-Of-Building-Part4-RosO1-101
 
 Industrial-Building-Addition_Loading-Dock-Work-ColB1-103
 
 Industrial-Building-Addition_Insulated-Siding-Part2-ColB1-103
 
 Industrial-Building-Addition_Site-Civil-Work-Concrete-Paving-ColB1-103
 
 Rosie-O-Gradys_Synthetic-Stucco-Work-On-Exterior-Face-Of-Building-Part3-RosO1-101
 
 Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part6-RosO1-101
 
 Industrial-Building-Addition_Insulated-Siding-ColB1-103
 
 Industrial-Building-Addition_Concrete-Floor-ColB1-103
 
 Industrial-Building-Addition_Site-Civil-Work-Part6-ColB1-103
 
 Industrial-Building-Addition-2-Ft-Deep-Pit-In-The-Floor-ColB1-103
 
 Industrial-Building-Addition-10-Ft-Deep-Pit-In-The-Floor-Part3-ColB1-103
 
 Rosie-O-Gradys_Synthetic-Stucco-Work-On-Exterior-Face-Of-Building-Part2-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Interior-Finish-Work-Part4-RosO1-101
 
 Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part5-RosO1-101
 
 Rosie-O-Gradys_Synthetic-Stucco-Work-On-Exterior-Face-Of-Building-RosO1-101
 
 Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part4-RosO1-101
 
 Industrial-Building-Addition-10-Ft-Deep-Pit-In-The-Floor-Part2-ColB1-103
 
 Industrial-Building-Addition_Loading-Dock-Concrete-Slab-ColB1-103
 
 Industrial-Building-Addition_Block-Masonry-Work-Part4-ColB1-103
 
 Industrial-Building-Addition_Site-Civil-Work-Part5-ColB1-103
 
 Industrial-Building-Addition_Pouring-Rat-Wall-Along-With-Part-Of-The-Floor-Part2-ColB1-103
 
 Industrial-Building-Addition-10-Ft-Deep-Pit-In-The-Floor-ColB1-103
 
 Rosie-O-Gradys_Building-Addition-Interior-Finish-Work-Part3-RosO1-101
 
 Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part3-RosO1-101
 
 Industrial-Building-Addition_Block-Masonry-Work-Part3-ColB1-103
 
 Industrial-Building-Addition_Installation-Of-Roof-Panels-And-Soffit-Insulation-Part5-ColB1-103
 
 Industrial-Building-Addition_Pouring-Rat-Wall-Along-With-Part-Of-The-Floor-ColB1-103
 
 Rosie-O-Gradys_Building-Addition-Interior-Finish-Work-Part2-RosO1-101
 
 Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part2-RosO1-101
 
 Industrial-Building-Addition_Block-Masonry-Work-Part2-ColB1-103
 
 Industrial-Building-Addition_Site-Civil-Work-Part4-ColB1-103
 
 Industrial-Building-Addition_Installation-Of-Roof-Panels-And-Soffit-Insulation-Part4-ColB1-103
 
 Rosie-O-Gradys_Building-Addition-Face-Brick-And-Stone-Veneer-Installation-Part5-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Interior-Finish-Work-RosO1-101
 
 Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Face-Brick-And-Stone-Veneer-Installation-Part4-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Drywall-Installation-Part2-RosO1-101
 
 Industrial-Building-Addition_Installation-Of-Roof-Panels-And-Soffit-Insulation-Part3-ColB1-103
 
 Industrial-Building-Addition_Site-Civil-Work-Part3-ColB1-103
 
 Rosie-O-Gradys_Building-Addition-Face-Brick-And-Stone-Veneer-Installation-Part3-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Drywall-Installation-RosO1-101
 
 Installing-HVAC-Units-On-Roof-Of-An-Existing-Building-With-Pitched-Roof-Part2-PonV1-101
 
 Installing-HVAC-Units-On-Roof-Of-An-Existing-Building-With-Pitched-Roof-PonV1-101
 
 Rosie-O-Gradys_Building-Addition-Face-Brick-And-Stone-Veneer-Installation-Part2-RosO1-101
 
 Industrial-Building-Addition_Installation-Of-Roof-Panels-And-Soffit-Insulation-Part2-ColB1-103
 
 Industrial-Building-Addition_Site-Civil-Work-Part2-ColB1-103
 
 Rosie-O-Gradys_Building-Addition-Face-Brick-And-Stone-Veneer-Installation-RosO1-101
 
 Industrial-Building-Addition_Insatallation-Of-Roof-Panels-And-Soffit-Insulation-ColB1-103
 
 Rosie-O-Gradys_Building-Addition-Rubber-Roof-Installation-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Rough-Framing-Inspection-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Sprinkler-Heads-And-Piping-Installation-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Electrical-Wiring-Installation-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Progress-Report-20080912-RosO1-101
 
 Industrial-Building-Addition_Site-Civil-Work-ColB1-103
 
 Industrial-Building-Addition_Block-Masonry-Work-ColB1-103
 
 Fixing-Leak-In-Basement-Existing-House-In-Southeastern-Michigan-Part3
 
 Fixing-Broken-Face-Bricks-In-Existing-House-Part2-In-Southeastern-Michigan
 
 Fixing-Leak-In-Basement-Existing-House-In-Southeastern-Michigan-Part2
 
 Fixing-Broken-Face-Bricks-In-Existing-House-In-Southeastern-Michigan
 
 Fixing-Leak-In-Basement-Existing-House-In-Southeastern-Michigan
 
 Rosie-O-Gradys_Building-Addition-Face-Brick-Installation-Part2-RosO1-101
 
 Industrial-Building-Addition_Erection-Of-Premanufactured-Building-Frames-Part3-ColB1-103
 
 Existing-Facility_Structural-Modifications-For-Converting-Into-A-Loft-And-An-Art-Studio-MAP-104
 
 Existing-House_Concrete-Deck-And-Patio-Addition-Part2-OseH1-103
 
 Existing-House_Concrete-Deck-And-Patio-Addition-OseH1-103
 
 Existing-House_Fix-To-Restore-Structural-Integrity-Of-Cut-Framing-Part2-OseH1-102
 
 Existing-House_Fix-To-Restore-Structural-Integrity-Of-Cut-Framing-OseH1-102
 
 Rosie-O-Gradys_Building-Inspection-And-Building-Interior-Work-RosO1-101
 
 Rosie-O-Gradys_Building-Addition-Face-Brick-Installation-RosO1-101
 
 Industrial-Building-Addition_Erection-Of-Premanufactured-Building-Frames-Part2-ColB1-103
 
 Industrial-Building-Addition_Erection-Of-Premanufactured-Building-Frames-ColB1-103
 
 Industrial-Building-Addition_Loading-Dock-Concrete-Walls-ColB1-103
 
 Rosie-O-Gradys_Prep-Work-For-Installation-Of-Roof-Top-Units-RosO1-101
 
 Rosie-O-Gradys_Installation-Of-Window-Frames-In-ICF-Walls-RosO1-101
 
 Angelicas-Place-Assisted-Living_Aug-02-2008-Update-Project-KalA1-101
 
 Industrial-Building-Addition_Loading-Dock-West-Side-Concrete-Wall-ColB1-103
 
 Rosie-O-Gradys_Roof-And-Exterior-Wall-Finish-Prep-Work-Part3-RosO1-101
 
 Rosie-O-Gradys_Plumbing-Work-For-First-Floor-RosO1-101
 
 Industrial-Building-Addition_Forming-And-Concreting-Column-Footing-Piers-Part2-Project-ColB1-103
 
 Rosie-O-Gradys_Roof-And-Exterior-Wall-Finish-Prep-Work-Part2-RosO1-101
 
 Rosie-O-Gradys_Roof-And-Exterior-Wall-Finish-Prep-Work-RosO1-101
 
 Rosie-O-Gradys_Artist-Rendering-Versus-Building-Addition-Taking-Shape-RosO1-101
 
 Rosie-O-Gradys_Protecting-Second-Floor-Concrete-Surface-From-Damage-RosO1-101
 
 Rosie-O-Gradys_Window-Bucks-In-Place-Getting-Ready-For-Installing-Windows-RosO1-101
 
 Rosie-O-Gradys_Installation-Of-Roof-Deck-And-Roof-Facia-Metal-Frame-RosO1-101
 
 Industrial-Building-Addition_Forming-And-Concreting-Column-Footing-Piers-Project-ColB1-103
 
 Rosie-O-Gradys_Installation-Of-Roof-Facia-Backup-EPS-Board-RosO1-101
 
 Rosie-O-Gradys_Completing-Installation-Of-Second-Floor-Load-Bearing-Walls-And-Roof-Joists-RosO1-101
 
 Rosie-O-Gradys_Second-Floor-Concrete-Score-Lines-As-Part-Of-Decorative-Finish-RosO1-101
 
 Industrial-Building-Addition_Concrete-Placement-In-Column-Footings-Part2-Project-ColB1-103
 
 Rosie-O-Gradys_Second-Floor-Concrete-Pour-Project-RosO1-101
 
 Rosie-O-Gradys_Shoring-For-Second-Floor-Concrete-Pour-Project-RosO1-101
 
 Rosie-O-Gradys_Jul-14-2008-Update-Project-RosO1-101
 
 Rosie-O-Gradys_Jul-11-2008-Update-Project-RosO1-101
 
 Rosie-O-Gradys_Jul-10-2008-Update-Project-RosO1-101
 
 Mezzanine-Floor-Addition-In-Auto-Repair-Shop-Project-SimH1-104
 
 Rosie-O-Gradys_Jul-09-2008-Update-Project-RosO1-101
 
 Rosie-O-Gradys_Jul-08-2008-Update-Project-RosO1-101
 
 Rosie-O-Gradys_Jul-03-2008-Update-Project-RosO1-101
 
 Industrial-Building-Addition_Concrete-Placement-In-Column-Footings-Project-ColB1-103
 
 Rosie-O-Gradys_Jul-02-2008-Update-Project-RosO1-101
 
 Industrial-Building-Addition_Readiness-For-Pouring-Column-Footings-Project-ColB1-103
 
 Industrial-Building-Addition_Digging-For-Column-Footings-Project-ColB1-103
 
 Rosie-O-Gradys_Jun-30-2008-Update-Project-RosO1-101
 
 Rosie-O-Gradys_Jun-27-2008-Update-Project-RosO1-101
 
 Remodeling-Whole-House-In-Southeastern-Michigan-Part2-Project-NapR1-101
 
 Remodeling-Whole-House-In-Southeastern-Michigan-Project-NapR1-101
 
 Rosie-O-Gradys_Getting-Ready-To-Install-Second-Floor-Metal-Deck-Project-RosO1-101
 
 Rosie-O-Gradys_Refreshing-Soil-Erosion-Control-Measures-Project-RosO1-101
 
 Rosie-O-Gradys_Second-Floor-Joists-Installation-Part3-Project-RosO1-101
 
 Rosie-O-Gradys_Second-Floor-Joists-Installation-Part2-Project-RosO1-101
 
 Rosie-O-Gradys_Second-Floor-Joists-Installation-Project-RosO1-101
 
 Aircraft-Hangar-Building-Foundation-for-Coletta-Builders-Project-ColB1yae-104
 
 Angelicas-Place-Assisted-Living_Getting-Ready-For-Site-Paving
 
 Angelicas-Place-Assisted-Living_Jun-19-2008-Update
 
 Facia-Upgrade-Front-Porch-Existing-House-In-Southeastern-Michigan
 
 Deteriorated-Front-Porch-Facia-Existing-House-In-Southeastern-Michigan
 
 Rosie-O-Gradys_Structural-Steel-Installation-Project-RosO1-101
 
 Rosie-O-Gradys_Concrete-Placement-In-Header-Below-Second-Floor-Project-RosO1-101
 
 Rosie-O-Gradys_Granular-Backfill-Upto-BrickLedge-Level-Project-RosO1-101
 
 Rosie-O-Gradys_Installing-Anchor-Plates-For-Rim-Joist-For-Supporting-Second-Floor-Project-RosO1-101
 
 Rosie-O-Gradys_Concrete-Placed-From-Window-Sill-To-Header-Below-Second-Floor-Project-RosO1-101
 
 Rosie-O-Gradys_Installing-ICF-Wall-Forms-Above-Window-Sill-Level-Project-RosO1-101
 
 Angelicas-Place-Assisted-Living_Jun-07-2008-Update
 
 Steel-Studs-And-Joists_A-Look-Inside-The-Plant
 
 Rosie-O-Gradys_Concrete-Placement-In-ICF-Walls-To-Window-Sill-Level-Project-RosO1-101
 
 Rosie-O-Gradys-Building-Addition_Installing-ICF-Walls-To-Window-Sill-Level-Project-RosO1-101
 
 New-House-With-ICF-Basement-Walls-Backfilll-Issues-Project-AgoT1-101
 
 New-House-With-ICF-Basement-Walls-Structural-Design-Project-AgoT1-101
 
 ICF-House-New-Construction-Dormer-Window-Addition-Project-EneE1OmaE1-101
 
 ICF-House-New-Construction-Framing-Issues-Part3-Project-EneE1OmaE1-101
 
 ICF-House-New-Construction-Framing-Issues-Part2-Project-EneE1OmaE1-101
 
 ICF-House-New-Construction-Framing-Issues-Project-EneE1OmaE1-101
 
 Rebuild-Fire-Damaged-House-In-Washington-Township-Michigan-Part2
 
 Angelicas-Place-Assisted-Living_Elevator-Shaft-Work-and-Interior-and-Exterior-Finish
 
 Rebuild-Fire-Damaged-House-In-Washington-Township-Michigan
 
 Rehabilitating-Existing-Idle-Industrial-Building_To-A-Storage-Facility-Part3
 
 Rehabilitating-Existing-Idle-Industrial-Building_To-A-Storage-Facility-Part2
 
 Rehabilitating-Existing-Idle-Industrial-Building_To-A-Storage-Facility-Part1
 
 Looking-at-a-Basement-Wall-Failure-During-Backfill-Operation-Part3
 
 Looking-at-a-Basement-Wall-Failure-During-Backfill-Operation-Part2
 
 Looking-at-a-Basement-Wall-Failure-During-Backfill-Operation-Part1
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Installation-of-Exterior-Siding
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Installation-of-Building-Components-3
 
 Rosie-O-Gradys-In-Chesterfield-Twp-Michigan_Concrete-In-Footings-For-Building-Addition
 
 Rosie-O-Gradys-In-Chesterfield-Twp-Michigan_Footings-For-Building-Addition
 
 Rosie-O-Gradys-In-Chesterfield-Twp-Michigan_Site-Civil-Work-For-Building-Addition
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Installation-of-Building-Components-2
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Installation-of-Building-Components
 
 Rosie-O-Gradys-Restaurant-&-Pub-on-23-Mile-Road-in-Chesterfield-Twp-Michigan
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Steel-Roof-Joists-And-Trusses
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Steel-Stud-Walls-And-Steel-Stair-Stringers
 
 US12-Bar-On-Michigan-Ave-Addition-Modification-to-Building-in-Wayne-Michigan-Jun-06-07-Update
 (posted on Jan-20-2008 -- makes up for missing link in Jun-2007)
 
 Relieving-An-Existing-ICF-Wall-Header-And-Supporting-Posts-Of-Imposed-Roof-Loading
 
 Reinforcing-An-Existing-Wall-Header-And-Supporting-Posts
 
 Loading-Residential-Structure-MAP_1-103
 
 Evaluating-Condition-Of-Structural-Steel-In-A-Commercial-Building-Of-1960s-Vintage_KouR1-101b
 
 Prefabricated-Concrete-Fiber-Panels-In-The-Roof-Of-A-Commercial-Building_KouR1-101a
 
 Looking-At-The-Wooded-Lake-Front-Lot-AS-Potential-Home-Site--BenK1-101
 
 Foundation-Structural-Arrangement-And-Member-Design-MAP_1-103
 
 First-Floor-Structural-Arrangement-And-Member-Design-MAP_1-103
 
 Second-Floor-Structural-Arrangement-And-Member-Design-MAP_1-103
 
 Roof-Structural-Arrangement-And-Member-Design-MAP_1-103
 
 Custom-Truss-Design-With-The-Bottom-Chord-Raised-In-The-Middle
 
 Header-For-ICF-Wall-With-Light-Framed-Second-Story-And-Roof-Above
 
 ICF-4-Inch-Panel-Wall-And-Footing-To-Existing-8-Inch-Panel-Wall
 
 New-8-Inch-Panel-Wall-And-Footing-To-Existing-8-Inch-Panel-Wall
 
 Buildblock-8-Ich-Panel-Wall-To-Be-Fastened-To-8-Inch-Panel-Buildblock-Wall-Already-In-Place
 
 Joining-New-4-inch-ICF-Panel-Wall-To-8-inch-ICF-Panel-Wall-In-Place
 
 Structural-Integrity-Evaluation-Trusses-Cut-In-Existing-House-To-Raise-Height-Of-Room-At-One-End
 
 Frost-Protected-Shallow-Foundation-For-An-ICF-Building-Wall-In-Southeastern-Michigan
 
 Cutting-Door-Opening-in-An-Existing-ICF-Wall
 
 Gander-Mountain-Store-Summit-Mall-Waterford-Michigan-Door-Addition-Project-3
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Steel-Stud-Walls-Above-Second-Floor
 
 Gander-Mountain-Store-Summit-Mall-Waterford-Michigan-Door-Addition-Project-2
 
 Gander-Mountain-Store-Summit-Mall-Waterford-Michigan-Door-Addition-Project
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Second-Floor-Concrete-Placement
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Readiness-for-Second-Floor-Concrete-Placement
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_concrete-placement-in-wraparound-porch
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_readiness-for-concrete-placement-in-porch-slab
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Light-Gage-Steel-Joists-For-Second-Floor-Deck
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_GlasRoc-Sheathing-For-Exterior-Stud-Walls
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Steel-Stud-Walls-Above-First-Floor
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Footing-for-Wraparound-Porch
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_First-Floor-on-Metal-Deck-Concrete-Placement
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Readiness-for-First-Floor-Concrete-Placement
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Shoring-For-First-Floor-Concrete-Placement
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Metal-Studs-in-Basement
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Open-Web-Steel-Joists-for-First-Floor
 
 Existing-Pole-Barn-in-Rochester-Hills-Michigan-to-be-Relocated-in-Ira-Twp-Michigan-3
 
 Existing-Pole-Barn-in-Rochester-Hills-Michigan-to-be-Relocated-in-Ira-Twp-Michigan-2
 
 Existing-Pole-Barn-in-Rochester-Hills-Michigan-to-be-Relocated-in-Ira-Twp-Michigan
 
 Energy-Efficient-ICF-Walls-For-House-With-Insul-Deck-Floor
 
 Energy-Efficient-House-Shoring-Installation-For-First-Floor-Insul-Deck-Panels
 
 Energy-Efficient-House-First-Floor-Insul-Deck-Panels-Installation
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Basement-Slab-Concrete-Placement
 
 House-Modification_Retrofitting-Existing-House-With-An-Egress-Window-2
 
 House-Modification_Retrofitting-Existing-House-With-An-Egress-Window
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Basement-ICF-Walls-Concrete-Placement
 
 Modifying-Existing-Trusses-to-Carve-Out-a-Room-in-the-Garage-Attic-3
 
 Modifying-Existing-Trusses-to-Carve-Out-a-Room-in-the-Garage-Attic-2
 
 Modifying-Existing-Trusses-to-Carve-Out-a-Room-in-the-Garage-Attic
 
 Avon-North-Hill-Lanes-in-Rochester-Hills-Michigan_LCD-Plasma-Screen-Monitor-Addition
 
 Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Footing-Concrete-Placement
 
 Latest project Update added in Jun 2007
 
 Condo-Renovation_Structural-Integrity-Evaluation-Of-Cut-Trusses-2
 
 Condo-Renovation_Structural-Integrity-Evaluation-Of-Cut-Trusses
 
 Guniting-20ftx40ft-Pool-With-10ftx8ft-Spa-Both-Art-And-Science
 
 Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Footings-For-Stairs-To-First-Floor-Deck-3
 
 Guniting-20ftx40ft-Pool-With-10ftx8ft-Spa-2
 
 Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Footings-For-Stairs-To-First-Floor-Deck-2
 
 Guniting-20ftx40ft-Pool-With-10ftx8ft-Spa
 
 Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Reinforcing-Steel-Installation-Prior-To-Guniting-2
 
 Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Plumbing-2
 
 Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Finish-Brick-Work-At-Building-To-Match-Existing
 
 Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Plumbing
 
 Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Reinforcing-Steel-Installation-Prior-To-Guniting
 
 US12-Bar-On-Michigan-Ave-Addition-Modification-to-Building-in-Wayne-Michigan-Jun-14-07-Grand-Opening
 
 Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Footings-For-Stairs-To-First-Floor-Deck
 
 Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Excavation-2
 
 Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Excavation
 
 Structural-Integrity-Review-of-Apartments-Subsequent-To-Fire-In-Complex
 
 US12-Bar-On-Michigan-Ave-Addition-Modification-to-Building-in-Wayne-Michigan-Jun-07-07-Update
 
 Front-Entrance-With-Handicap-Ramp-5_US12-Bar-Building-in-Wayne-Michigan
 posted on Jun-06-2007
 
 Setting-Up-Business-Facility-On-Existing-Property-3-In-Romulus-Michigan
 posted on Jun-05-2007
 
 Setting-Up-Business-Facility-On-Existing-Property-2-In-Romulus-Michigan
 posted on Jun-04-2007
 
 Renovation-of-Commercial-Building-2-in-Wayne-Michigan
 posted on Jun-03-2007
 
 Sign-Installation-Pole-Mounted_Amani-Restaurant-in-Dearborn-Michigan
 posted on Jun-02-2007
 
 US12-Bar-On-Michigan-Ave-Addition-Modification-to-Building-in-Wayne-Michigan-Jun-01-07-Update
 posted on Jun-01-2007
 
 Latest project Update added in May 2007
 
 Sign-Installation-on-Facade-of-Amani-Restaurant-2-in-Dearborn-Michigan
 posted on May-31-2007
 
 Sign-Installation-on-Facade-of-Amani-Restaurant-in-Dearborn-Michigan
 posted on May-30-2007
 
 Aircraft-Hangar-Building-Foundation-for-Coletta-Builders
 posted on May-29-2007
 
 Sign-Installation-on-Facade-of-A-School-Building-3-in-Dearborn-Michigan
 posted on May-27-2007
 
 Sign-Installation-on-Facade-of-A-School-Building-2-in-Dearborn-Michigan
 posted on May-26-2007
 
 Front-Entrance-With-Handicap-Ramp-4_US12-Bar-Building-in-Wayne-Michigan
 posted on May-24-2007
 
 Sign-Installation-on-Facade-of-A-School-Building-in-Dearborn-Michigan
 posted on May-21-2007
 
 aircraft-hanger-building-01-cost-breakdown
 posted on May-20-2007
 
 Rehabilitation-Of-An-Existing-Commercial-Building-5-As-
 A-MotorCyle-Accessories-Store
 posted on May-19-2007
 
 US12-Bar-On-Michigan-Ave-Addition-Modification-to-Building-in-Wayne-Michigan
 posted on May-18-2007
 
 Rehabilitation-Of-An-Existing-Commercial-Building-4-As-
 A-MotorCyle-Accessories-Store
 posted on May-17-2007
 
 Rehabilitation-Of-An-Existing-Commercial-Building-3-As-A-MotorCyle-
 Accessories-Store
 posted on May-16-2007
 
 Front-Entrance-With-Handicap-Ramp-3_Building-in-Wayne-Michigan
 posted on May-15-2007
 
 Rehabilitation-Of-An-Existing-Commercial-Building-2-As-A-MotorCyle-Accessories-Store.
 posted on May-14-2007
 
 Rehabilitation-Of-An-Existing-Commercial-Building-As-A-MotorCyle-Accessories-Store.
 posted on May-13-2007
 
 Front-Entrance-With-Handicap-Ramp-2_Building-in-Wayne-Michigan
 posted on May-10-2007
 
 Converting-Existing-Industrial-Building-For-Indoor-GoKart-Racing
 posted on May-09-2007
 
 Light-Gage-Metal-Framing-for-Select-Appurtenances-3_A-Look-At-The-Finished-Product-The-Ring
 posted on May-08-2007
 
 Front-Entrance-With-Handicap-Ramp_Building-in-Wayne-Michigan
 posted on May-06-2007
 
 Latest project Update added in Apr 2007
 
 Structural-Modification-to-Existing-Industrial-Building-2
 posted on Apr-25-2007 Update
 
 Structural-Modification-to-Existing-Industrial-Building
 posted on Apr-23-2007 Update
 
 Rehabilitation of Apartment Building for Aero Realty-2 in Wayne Michigan
 Apr-05-2007 Update
 
 Setting-Up-Business-Facility-On-Existing-Property-In-Romulus-Michigan
 Apr-04-2007 Update
 
 ICF-Wall-Setback-On-The-Second-Floor-As-Deep-Beam-With-No-Support-Below
 Apr-03-2007 Update
 
 Framing-for-Suspended-Fan-Ceiling-3_Building-in-Wayne-Michigan
 Apr-02-2007 Update
 
 Rehabilitation-of-Commercial-Building-Good-News-Got-The-Building-Off-The-Dangerous-Building-List
 Apr-01-2007 Update
 
 Latest project Update added in Mar 2007
 
 Light-Gage-Metal-Stud-Walls-Structural-Design-Calcs_Building-in-Rochester-Michigan
 Mar-31-2007 Update
 
 FollowUp-On-A-Heart-Warming-Story-About-Forberger-New-Lake-Front-ICF-House-In-Commerce-Twp-Michigan
 Mar-26-2007 Update
 
 A-Heart-Warming-Story-About-Forberger-New-Lake-Front-ICF-House-In-Commerce-Twp-Michigan
 Mar-22-2007 Update
 
 Framing-for-Suspended-Fan-Ceiling-2_Building-in-Wayne-Michigan
 Mar-11-2007 Update
 
 Forberger-New-Lake-Front-ICF-House-2-in-Commerce-Twp-Michigan
 Mar-10-2007 Update
 
 Framing-for-Suspended-Fan-Ceiling_Building-in-Wayne-Michigan
 Mar-09-2007 Update
 
 Forberger-New-Lake-Front-ICF-House-in-Commerce-Twp-Michigan
 Mar-07-2007 Update
 
 Rehabilitation of Apartment Building for Aero Realty in Wayne Michigan
 Mar-02-2007 Update
 
 Light-Gage-Metal-Framing-for-Select-Appurtenances-2_Building-in-Rochester-Michigan
 Mar-01-2007 Update
 
 
 
 | Latest project Update added in Feb 2007 
 Enhancement-of-Storage-Warehouse-2-in-Wayne-Michigan
 Feb-28-2007 Update
 
 Light-Gage-Metal-Framing-for-Select-Appurtenances_Building-in-Rochester-Michigan
 Feb-27-2007 Update
 
 Enhancement-of-Storage-Warehouse-in-Wayne-Michigan
 Feb-26-2007 Update
 
 New-Roof-for-Part-of-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Feb-23-2007 Update
 
 New-Face-Brick-4-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Feb-22-2007 Update
 
 Electrical-2 for Stehr House in Highland Twp Michigan
 Feb-18-2007 Update
 
 Compaction-of-Soil-and-Use-of-Vapor-Barrier_for-Dan-Hossack-ICF-House-in-Independence-Twp-Michigan
 Feb-17-2007 Update
 
 HVAC-Installation-Work_for-Stehr-House-in-Highland-Twp-Michigan
 Feb-16-2007 Update
 
 Rehabilitation-of-commercial-building-3-in-Wayne-Michigan
 Feb-12-2007 Update
 
 New-Face-Brick-3-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Feb-10-2007 Update
 
 New-ICF-House-in-Northfield-Twp-Michigan
 Feb-09-2007 Update
 
 Rehabilitation-of-commercial-building-2-in-Wayne-Michigan
 Feb-08-2007 Update
 
 New-Face-Brick-2-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Feb-07-2007 Update
 
 Pool-Addition-3_in-Bloomfield-Twp-Michigan
 Feb-06-2007 Update
 
 After-Shell-Completion-Work_for-Stehr-House-in-Highland-Twp-Michigan
 Feb-05-2007 Update
 
 Interior-Work-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Feb-03-2007 Update
 
 Pool-Addition-2_in-Bloomfield-Twp-Michigan
 Feb-02-2007 Update
 
 Latest project Update added in Jan 2007
 
 New-Face-Brick-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Jan-31-2007 Update
 
 Electrical-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Jan-29-2007 Update
 
 Abnormal-Loading-Huge-Chunk-of-Ice-Falling-from-Sky
 Jan-28-2007 Update
 
 Rehabilitating-Existing-Building-2-in-Highland-Park-Michigan
 Jan-27-2007 Update
 
 Rehabilitating-Existing-Building-in-Highland-Park-Michigan
 Jan-26-2007 Update
 
 Face Lift-2 For Harrison Plaza in Livonia Michigan
 Jan-24-2007 Update
 
 New-Accessories-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Jan-23-2007 Update
 
 Interior-Framing-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Jan-22-2007 Update
 
 Footing-for-New-Face-Brick-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Jan-20-2007 Update
 
 Renovation-of-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
 Jan-19-2007 Update
 
 Accessory-Item-Installation-on-ICF-Walls_for-Dan-Hossack-ICF-House-in-Independence-Twp-Michigan
 Jan-17-2007 Update
 
 Way of the Energy Efficient Building Champions
 An interview series ...
 Added Jan-15-2007
 
 Face-Brick-and-Stone-Installation_for-Dan-Hossack-ICF-House-in-Independence-Twp-Michigan
 Jan-14-2007 Update
 
 Open-Web-Steel-Joist-Installation_for-Dan-Hossack-ICF-House-in-Independence-Twp-Michigan
 Jan-13-2007 Update
 
 Boulder-Retaining-Wall-at-North-End-of-Driveway_for-Stehr-House-in-Highland-Twp-Michigan
 Jan-11-2007 Update
 
 Rough-Framing-Inspection_for-Dan-Hossack-ICF-House-in-Independence-Twp-Michigan
 Jan-10-2007 Update
 
 New-ICF-House-in-Independence-Twp-Michigan
 Jan-09-2007 Update
 
 Pool-Addition_in-Bloomfield-Twp-Michigan
 Jan-05-2007 Update
 
 Dan-Hossack-ICF-House-with-the-elevated-deck
 Jan-02-2007 Update
 
 Latest project Update added in Dec 2006
 
 Elevated-Deck_for-Dan-Hossack-ICF-House-5024-Rockaway-Lane-in-Independence-Twp-Michigan
 Dec-30-2006 Update
 
 Electrical for Stehr House in Highland Twp Michigan
 Dec-29-2006 Update
 
 New ICF House by Merit Builders
 Dec-28-2006 Update
 
 Basement-Sump-Line-Drainage_for-Project-in-Wayne-Michigan
 Posted on Dec-27-2006
 
 Grading-for-Surface-Runoff_for-Project-in-Wayne-Michigan
 Posted on Dec-26-2006
 
 Grading-and-Seeding-Sodding-Alley_for-Project-in-Wayne-Michigan
 Posted on Dec-23-2006
 
 New ICF House by Merit Builders
 Dec-22-2006 Update
 
 Installation of Doors and Windows-3 for Stehr House in Highland Twp Michigan
 Dec-21-2006 Update
 
 Framing of Interior Stud Walls-4 for Stehr House in Highland Twp Michigan
 Dec-20-2006 Update
 
 Septic Field-3 for Stehr House in Highland Twp Michigan
 Dec-20-2006 Update
 
 Septic Field-2 for Stehr House in Highland Twp Michigan
 Dec-19-2006 Update
 
 Septic Field for Stehr House in Highland Twp Michigan
 Dec-18-2006 Update
 
 Framing of Interior Stud Walls-3 for Stehr House in Highland Twp Michigan
 Dec-18-2006 Update
 
 Electrical Meter and Panel Installation-3 for Stehr House in Highland Twp Michigan
 Dec-18-2006 Update
 
 Framing of Interior Stud Walls-2 for Stehr House in Highland Twp Michigan
 Dec-17-2006 Update
 
 Polyurethane Spray Insulation-2 for Stehr House in Highland Twp Michigan
 Dec-16-2006 Update
 
 Framing of Interior Stud Walls for Stehr House in Highland Twp Michigan
 Dec-15-2006 Update
 
 Rehabilitation-of-commercial-building-in-Wayne-Michigan
 Dec-14-2006 Update
 
 Polyurethane Spray Insulation for Stehr House in Highland Twp Michigan
 Dec-13-2006 Update
 
 First Floor Slab Concrete Placement-2 for Stehr House in Highland Twp Michigan
 Dec-12-2006 Update
 
 Electrical Meter and Panel Installation-2 for Stehr House in Highland Twp Michigan
 Dec-11-2006 Update
 
 Certification-per-HUDs-PFGMH_for-house-in-Wales-Michigan
 Dec-10-2006 Update
 
 Addition_to-Party-Store-in-Detroit-Michigan
 Dec-09-2006 Update
 
 Installation of Doors and Windows-2 for Stehr House in Highland Twp Michigan
 Dec-08-2006 Update
 
 Roof Shingles-4 for Stehr House in Highland Twp Michigan
 Dec-08-2006 Update
 
 Installation of Doors and Windows for Stehr House in Highland Twp Michigan
 Dec-07-2006 Update
 
 Water Well Hookup and Tank Installation for Stehr House in Highland Twp Michigan
 Dec-07-2006 Update
 
 Backfill Against Basement Walls-3 for Stehr House in Highland Twp Michigan
 Dec-07-2006 Update
 
 Electrical Meter and Panel Installation for Stehr House in Highland Twp Michigan
 Dec-07-2006 Update
 
 Backfill Against Basement Walls-2 for Stehr House in Highland Twp Michigan
 Dec-06-2006 Update
 
 Roof Shingles-3 for Stehr House in Highland Twp Michigan
 Dec-06-2006 Update
 
 First Floor Slab Concrete Placement for Stehr House in Highland Twp Michigan
 Dec-05-2006 Update
 
 Backfill Against Basement Walls for Stehr House in Highland Twp Michigan
 Dec-04-2006 Update
 
 Roof Shingles-2 for Stehr House in Highland Twp Michigan
 Dec-04-2006 Update
 
 Steel Framing in Porch Area-2 for Stehr House in Highland Twp Michigan
 Dec-04-2006 Update
 
 Face Lift-2 for Atoms Juice Bar at 15104 Kercheval Street in Grosse Pointe Park Michigan
 Dec-03-2006 Update
 
 Face Lift for Atoms Juice Bar at 15104 Kercheval Street in Grosse Pointe Park Michigan
 Dec-02-2006 Update
 
 Truss-Framing-Fix-2_for-new-house-project-in-Saline-Michigan
 Dec-01-2006 Update
 
 Latest project Update added in Oct-Nov 2006
 
 Truss-Framing-Fix_for-new-house-project-in-Saline-Michigan
 Nov-30-2006 Update
 
 Steel Framing in Porch Area for Stehr House in Highland Twp Michigan
 Nov-29-2006 Update
 
 Roof Shingles for Stehr House in Highland Twp Michigan
 Nov-29-2006 Update
 
 Erecting Roof Trusses-8 for Stehr House in Highland Twp Michigan
 Nov-28-2006 Update
 
 Erecting Roof Trusses-7 for Stehr House in Highland Twp Michigan
 Nov-27-2006 Update
 
 Erecting Roof Trusses-6 for Stehr House in Highland Twp Michigan
 Nov-24-2006 Update
 
 Erecting Roof Trusses-5 for Stehr House in Highland Twp Michigan
 Nov-22-2006 Update
 
 Stairs from Basement to First Floor for Stehr House in Highland Twp Michigan
 Nov-22-2006 Update
 
 Post Footings in Porch Area for Stehr House in Highland Twp Michigan
 Nov-21-2006 Update
 
 Erecting Roof Trusses-4 for Stehr House in Highland Twp Michigan
 Nov-21-2006 Update
 
 Erecting Roof Trusses-3 for Stehr House in Highland Twp Michigan
 Nov-20-2006 Update
 
 Face Lift for Harrison Plaza in Livonia Michigan
 Nov-18-2006 Update
 
 Bonus Room Roof Trusses for Building in Ecorse Michigan
 Nov-17-2006 Update
 
 Erecting Roof Trusses-2 for Stehr House in Highland Twp Michigan
 Nov-14-2006 Update
 
 Erecting Roof Trusses for Stehr House in Highland Twp Michigan
 Nov-13-2006 Update
 
 light-gage-metal-framing_for-ICF-House-in-Ira-Township-Michigan
 Nov-11-2006 Update
 
 Roof Trusses Delivered for Stehr House in Highland Twp Michigan
 Nov-10-2006 Update
 
 Wall Plates for Roof Trusses for Stehr House in Highland Twp Michigan
 Nov-10-2006 Update
 
 Water Well Capped-Off for Stehr House in Highland Twp Michigan
 Nov-10-2006 Update
 
 First Floor ICF Walls Concrete Placement for Stehr House in Highland Twp Michigan
 Nov-06-2006 Update
 
 First Floor ICF Walls-02 for Stehr House in Highland Twp Michigan
 Nov-03-2006 Update
 
 First Floor ICF Walls for Stehr House in Highland Twp Michigan
 Oct-30 to Nov-02 2006 Update
 
 Water Well Drilling for Stehr House in Highland Twp Michigan
 Oct-26-2006 Update
 
 Electrical Transformer Installation for Stehr House in Highland Twp Michigan
 Oct-26-2006 Update
 
 Waterproofing Basement ICF Walls for Stehr House in Highland Twp Michigan
 Oct-24-2006 Update
 
 First Floor Steel Open Web Joists and Metal Deck - 03 for Stehr House in Highland Twp Michigan
 Oct-23-2006 Update
 
 First Floor Steel Open Web Joists and Metal Deck - 02 for Stehr House in Highland Twp Michigan
 Oct-19-2006 Update
 
 First Floor Steel Open Web Joists and Metal Deck for Stehr House in Highland Twp Michigan
 Oct-13-2006 Update
 
 First Floor Steel Open Web Joists for Stehr House in Highland Twp Michigan
 Oct-12-2006 Update
 
 Basement ICF Walls-concrete-placement for Stehr House in Highland Twp Michigan
 Oct-06-2006 Update
 
 Basement ICF Walls-03 for Stehr House in Highland Twp Michigan
 Oct-05-2006 Update
 
 Basement ICF Walls-02 for Stehr House in Highland Twp Michigan
 Oct-03-2006 Update
 
 Basement ICF Walls for Stehr House in Highland Twp Michigan
 Oct-02-2006 Update
 
 Latest project Update added in Sep-2006
 
 renovating-existing-building-for-Paul-Mitchell-School-in-Sterling-Heights-Michigan
 Sep-29-2006 Update
 
 third-floor-concrete-placement_for-Building-in-Ecorse-Michigan
 Sep-29-2006 Update
 
 Basement Slab Concrete Placement for Stehr House in Highland Twp Michigan
 Sep-29-2006 Update
 
 Radiant Heat Tubing in Basement Slab for Stehr House in Highland Twp Michigan
 Sep-27-2006 Update
 
 Basement Plumbing for Stehr House in Highland Twp Michigan
 Sep-19-2006 Update
 
 Insulation Under Basement Slab for Stehr House in Highland Twp Michigan
 Sep-18-2006 Update
 
 DrainTile on Inside for Stehr House in Highland Twp Michigan
 Sep-13-2006 Update
 
 Monolithic Slab Layout for Stehr House in Highland Twp Michigan
 Sep-11-2006 Update
 
 Trench Footing Inspection for Stehr House in Highland Twp Michigan
 Sep-08-2006 Update
 
 Trench Footings for Stehr House in Highland Twp Michigan
 Sep-07-2006 Update
 
 Basement Prep for Stehr House in Highland Twp Michigan
 Sep-05-2006 Update
 
 Latest project Update added on Sep-01-2006
 
 Construction Road for Stehr House in Highland Twp Michigan
 Sep-01-2006 Update
 
 Latest project Update added on Aug-31-2006
 
 Foundation Excavation for Stehr House in Highland Twp Michigan
 Aug-31-2006 Update
 
 Latest project Update added on Aug-30-2006
 
 New IcF House Project for Gary and Pam Stehr
 in Highland Township Michigan Aug-30-2006 Update
 
 Latest Happening added on Aug-23-2006
 
 Energy Efficient Building -- Thailand Projects Group
 formed
 
 Latest project Update added on Aug-21-2006
 
 Aircraft Hanger Building-01
 in St Clair Michigan
 Aug-21-2006 Update
 
 Latest project Update added on Aug-12-2006
 
 New ICf House for Gary and Pam Stehr
 in Highland Township Michigan
 Aug-12-2006 Update
 
 Latest project Update added on Jul-19-2006
 
 Block Wall Reinforcement With Carbon-Fiber/Kevlar-Grid
 House Renovation in Milford Michigan
 Jul-19-2006 Update
 
 Latest project Update added week of Jul-02-2006
 
 Renovation of Banquet Hall  in Warren Michigan
 Jul-04-2006 Update
 
 Renovation of Commercial Building  in Wayne Michigan
 Jul-03-2006 Update
 
 Latest project Update added week of Jun-25-2006
 
 ICF Home Project With Tall Basement Walls  in Milford Michigan
 Jun-30-2006 Update
 
 Design For ICF Home Project With Tall Basement Walls  in Milford Michigan Jul-01-2006 Update
 
 Design For ICF Home Project With Tall Basement Walls Jul-01-2006 Update
 
 ICF-home-project-tall-basement-walls Jun-30-2006 Update
 
 new-home-project-basement-walls May-27-2006 Update
 
 new-home-project-basement May-20-2006 Update
 
 new-home-project-foundation May-06-2006 Update
 
 ICF House KouJ1yae-101 Apr-29-2006 Update
 
 ICF House KLE_1yae-101 Apr-29-2006 Update
 
 ICF House EneE1-104 Apr-24-2006 Update
 
 ICF House MerB1yae-101 Apr-20-2006 Update
 
 ICF House EneE1-104 Apr-14-2006 Update
 
 ICF House RedW1yae-148 Apr-12-2006 Update
 
 House Addition ARC_1-101 Apr-12-2006 Update
 
 ICF House MerB1-101 Apr-10-2006 Update
 
 Aircraft Hangar Building in St Clair Michigan
 
 Fire Damaged House in Ypsilant Michigan
 
 Car Hit Damaged Building in Ypsilanti Michigan
 
 ReBuild / Renovate Damaged Areas from Car Hit
 Project Start ... Jan-2006
 
 Bar Building in Sumpter Twp Michigan
 
 Addition / Renovation of Facility
 Project Start ... Dec-2005
 
 House With Leaning Porch in Wayne Michigan
 
 Permanent Foundation for Porch Supports
 Project Start ... Aug-2004
 
 Multiunit Facility Bacony ... Wayne Michigan
 
 Structural Integrity Restoration
 Project Start ... Jul-2004
 
 
 
 
 
beginning of recent-projects-list
 
back to our recent-projects
 
back to our more-recent-projects
 
back to our Energy Efficient Building Network home page
 
Fill in the following form to subscribe to our upcoming news letter, to keepup with our latest updates, and to tell us how we can help:
 
 
 
 
 Partner With UsIf you are involved with energy efficient building projects as:
we invite you to tell us about yourself by filling in the special contact formDesigner
Architect
Engineer
Contractor
Specialty contractor
Surveyor
Developer
Supplier
Financier
....
 I have setup for your convenience. Let us see if we can create synergy
 by utilizing our combined resources and create a win-win situation!
 
 
 
 
 